We are proud to see the Gasometer Carpark in Takapuna progressing through the construction phase. Currently all the bored piles and most of the ground beams have been constructed, the tower crane and some precast shear walls have been erected.

Structus designed the carpark with Ignite Architects, Bluewater Project Management, NDY and T+T, for Panuku Development Auckland.
The carpark consists of 11 split levels, with an allowance for an additional 3 split levels. Long spanning composite steel beams and composite CHS columns provide the gravity structure. Reinforced concrete walls provide the lateral stability. Foundations consist of reinforced concrete beams spanning onto reinforced concrete piles down to rock.

The carpark is part of Panuku’s revitalisation of Takapuna’s town centre, which includes 420 carparks, electric car and bike charging stations, bike storage, motorbike parking, accessibility parking and changing rooms.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *